Talas Gold Mining Co*Talas, Kyrgyzstan(2005 / 2006) Enlarge photo |
Jerooy Gold Mine Development. 1.0 Million tons per annum Crushing & Stockpiling ROM Ore Milling, Thickening, Leaching, Carbon in Pulp (CIP) Plant, Acid Wash, Elution & Carbon Regeneration, Electrowinning & Smelting, Detox & Tailings Disposal, Process Plant Building. Infrastructure - Smelt House, Security and Change House Buildings, Laboratory, Workshops, Warehouse, Medical / Fire Station, Offices, Canteens, Accommodation. |
Feasibility Study Detailed Engineering Design (All Disciplines) Procurement Project Management Construction Management |
|
||
Amantaytau Gold Fields*Zarafshan, Uzbekistan(2005) Enlarge photo |
Vysokovoltnoye Heap Leach Project. (Silver & Gold) 1.0 Million tons per annum ROM, Crushing, Cement Storage & Addition, Agglomeration Drum, Heap Leach Stacking Equip, "On/Off" Leach Pads, Solution Collection, Solution Ponds, Heap Leach Irrigation System, Cyanide Storage & Dosing, Merril Crowe Recovery Plant, Smelting Furnace & Smelt House. |
Design Project Management Construction Management Technical Support Services |
|
||
Amantaytau Gold Fields*Zarafshan, Uzbekistan(2003 / 2004) Enlarge photo |
AGF Oxide Milling Project (Gold) 1.0 Million tons per annum Crushing & Stockpiling ROM ore Milling, Thickening, Leaching, Carbon in Pulp (CIP) Plant, Acid Wash, Elution & Carbon Regeneration, Electrowinning & Smelting, Tailings Disposal. Infrastructure - Smelt House, Security and Change House Buildings, Laboratory, Workshops, Medical / Fire Station Canteen, Raw Water Dam |
Feasibility Study Detailed Engineering Design (All Disciplines) Procurement Project Management Construction Management Erection Commissioning |
|
||
AngloGold Ltd*Mali(2001) Enlarge photo |
Sadiola Gold Project |
Plant Contract Supply, Ship and Erect all Equipment. Earthworks CIS & Solution Management Cyanide Plant Water Reticulation Oxygen Plant Leach Expansion |
|
||
AngloGold Ltd*Mali(2000) Enlarge photo |
Yatela Gold Mine Heap Leach Project 2.5 Million tons per annum |
Plant Contract Supply, Ship and Erect all Equipment. Earthworks Liners Village & Plant Buildings CIS & Solution Management Power Reticulation Carbon Regeneration Electrowinning Upgrade |
|
||
RandGold Resources*Mali(1997 / 1998) |
Syama Mine Housing Estate, Offices and Admin Block. Crusher and Stockpile, Power Generation, Flotation Plant, Elution / Electrowinning / Smelt House, Mine Security and Access Control, SAG and Regrind Mills, Warehouse, Oxygen Plant |
Detailed Engineering Design (All Disciplines) Procurement Project Management Construction Management |
|
||
RandGold Resources*Mali(1997 / 1998) Enlarge photo |
Loulo Mine Access and Feasibility Studies |
Infrastructural Requirements |
|
||
AvGold*Hartebeestfontein Division South Africa(1997) |
160,000 tpm SAG / FAG Mill Installation Feasibility Study |
Complete Investigation and Preparation of Bankable Documents All Disciplines |
|
||
Blyvooruitzicht Gold Mine*South Africa(1999) Enlarge photo |
Doornfontein Ore Belt Shaft to Stockpile |
|
|
||
Blyvooruitzicht Gold Mine*South Africa(1999) |
Vlei / Dam Retreatment Facility |
|
|
||
Blyvooruitzicht Gold Mine*South Africa(1999) |
Washing, Screening and Materials Handling Plant |
|
|
||
Blyvooruitzicht Gold Mine*South Africa(1998) |
Single Stream AARL 8 Tonne Elution Plant |
Detailed Engineering Design (All Disciplines) Procurement Project Management Construction Management |
|
||
Blyvooruitzicht Gold Mine*South Africa(1996 / 1997) |
Carbon in Pulp Plant 240,000 tpm |
Detailed Engineering Design (All Disciplines) Procurement Project Management Construction Management |
|
||
Buffelsfontein Gold Mines*South Africa(1997) |
8 Stage CIP Plant |
Detailed Engineering Design (All Disciplines) Procurement Project Management Construction Management |
|
||
Buffelsfontein Gold Mines*South Africa(1997) |
Relocation and Installation of ROM Mill complete with Conveyors, Silo and Mill Circuit |
Detailed Engineering Design (All Disciplines) Procurement Project Management Construction Management |
|
||
Caltex Refinery*Cape Town, South Africa(1990) |
Anti-Knock Engines and Associated Equipment |
Supply Procurement Specifications |
|
||
De Beers*Jwaneng(1994) |
Fines Recovery Plant |
Mechanical Design Project Managemen |
|
||
Doornfontein Gold Mines*South Africa(1997) |
120,000 tpm SAG Mill Thickening, Leach and CIP Project |
Detailed Engineering Design (All Disciplines) Procurement Project Management Construction Management |
|
||
DRD Gold Limited*South Africa(1996 & 1997) |
Central Elution Plant, Five Stream Central Elution and Electrowinning Facility |
Detailed Engineering Design (All Disciplines) Procurement Project Management Construction Management |
|
||
Durban Roodepoort Deep G.M*South Africa(1996 to 1997) |
Sag Mill, Circuit Thickening and CIP Plants |
Detailed Engineering Design (All Disciplines) Procurement Project Management Construction Management |
|
||
Fluor*SASOL, Secunda South Africa(1995) |
Sastech Sodium Cyanide / Acrylonitrile Plant |
Mechanical Design Specifications Contract / Orders Project Management Construction Management |
|
||
Fluor*South Africa(1995) |
Expansion of Palaborwa Copper Mine |
Mechanical Design Surface & Underground Design Specifications Cost Control Planning Fluor D.O Control Project Engineering |
|
||
Interboard*Krugersdorp, South Africa(1991) |
Ceramic Tile Drying Tunnel and Associated Fans and Ducting etc. |
Process Design Mechanical Design Procurement Specifications Project Management |
|
||
Kalagadi Breweries*(1995) |
Bright Beer Cellar Support Structure |
Structural & Civil Design Procurement Fabrication Project Management Construction Management |
|
||
Mine Waste Solutions*Stilfontein, South Africa(2002) |
Chemwes Enviromental Remediation Project 570,000 tpm CIL (Gold) |
Detailed Engineering Design (All Disciplines) Procurement Project Management Construction Management Erection Commissioning |
|
||
Newlands Brewery*Newlands , Cape Town(1994) |
Design of Dust Extraction System |
Design Procurement Project Management |
|
||
Newlands Brewery*Newlands , Cape Town(1993) |
Design of Packaging Hall High Pressure Cleaning System |
Design Specifications Contract / Tenders Project Management |
|
||
Pretklerk Gold Mine*Nigel, South Africa(1995) |
Responsible Engineer Contract Basis |
Mechanical & Electrical Design Operation & Maintenance Legal Requirements |
|
||
United Breweries*Ga-Rankua(1994) |
Utilities Supply to Packaging Line |
Utilities Design Steam Design Specifications Quality Assurance Project Management |
|
||
Rosslyn Brewery*South Africa(1992) |
Design of Brewhouse Water Mixing Stations, Pipe Work and Pumping System |
Mechanical Design Process Design Instrument Design Project Management |
|
||
South African Breweries*Prospecton, Durban(1989) |
Modification to CIP Plants and Beer Supply Lines |
Design Specifications Project Management |
|
||
South African Breweries*Prospecton, Durban(1988) |
Caustic Recovery, Filtration and Holding Plant |
Process Design Mechanical Design Civil / Structural Design Specifications Procurement Project Management |
|
||
SASOL Research & Development*Sasolburg, South Africa(1991) |
Design of Pressure Vessels, Pumps, Short Path Distillation Unit and Associated Equipment |
Mechanical Design Distillation Unit Process Design Supply (Part) |
|
||
West Wits Gold Mine*South Africa(1998 / 1999) Enlarge photo |
North Sand Dump - Pre-concentration Plant |
Feasibility Study Detailed Engineering Design (All Disciplines) Tender Documents |
|
||
West Wits Gold Mine*South Africa(1998) Enlarge photo |
220,000 tpm Leach Tank Farm Detailed Engineering Design (All Disciplines) Procurement Project Management Construction Management |
Detailed Engineering Design (All Disciplines) Procurement Project Management Construction Management |
|
||
West Witwatersrand Gold Mine*South Africa(1996) Enlarge photo |
North Sand Dump Reclamation and CIL Conversion |
Mechanical & Electrical Design Procurement Project Management Construction Management |
|
||
West Witwatersrand Gold Mine*South Africa(1995 / 1996) Enlarge photo |
Sag Mill Project Incorporating Crushing, Milling and Thickening Plant for 100,000 tpm rock and 120,000 tpm Sand |
Detailed Engineering Design (All Disciplines) PLC Control Procurement Project Management Construction Management Planning Cost Control |
|
||
Independence Gold Mining*Zimbabwe (PVT) LTD(2000) |
How Gold Mine Upgrade (AARL Elution Plant) |
Design Project Procurement |
|
||