Projects

Talas Gold Mining Co*
Talas, Kyrgyzstan
(2005 / 2006)


Enlarge photo
Jerooy Gold Mine Development.
1.0 Million tons per annum

Crushing & Stockpiling ROM Ore Milling, Thickening, Leaching, Carbon in Pulp (CIP) Plant, Acid Wash, Elution & Carbon Regeneration, Electrowinning & Smelting, Detox & Tailings Disposal, Process Plant Building.


Infrastructure - Smelt House, Security and Change House Buildings, Laboratory, Workshops, Warehouse, Medical / Fire Station, Offices, Canteens, Accommodation.

Feasibility Study
Detailed Engineering Design (All Disciplines)
Procurement
Project Management
Construction Management

$30 Million

back to top

 

Amantaytau Gold Fields*
Zarafshan, Uzbekistan
(2005)


Enlarge photo
Vysokovoltnoye Heap Leach Project.
(Silver & Gold)
1.0 Million tons per annum

ROM, Crushing, Cement Storage & Addition, Agglomeration Drum, Heap Leach Stacking Equip, "On/Off" Leach Pads, Solution Collection, Solution Ponds, Heap Leach Irrigation System, Cyanide Storage & Dosing, Merril Crowe Recovery Plant, Smelting Furnace & Smelt House.

Design
Project Management
Construction Management
Technical Support Services

$10 Million

back to top

 

Amantaytau Gold Fields*
Zarafshan, Uzbekistan
(2003 / 2004)


Enlarge photo
AGF Oxide Milling Project
(Gold)
1.0 Million tons per annum

Crushing & Stockpiling ROM ore Milling, Thickening, Leaching, Carbon in Pulp (CIP) Plant, Acid Wash, Elution & Carbon Regeneration, Electrowinning & Smelting, Tailings Disposal.


Infrastructure - Smelt House, Security and Change House Buildings, Laboratory, Workshops, Medical / Fire Station Canteen, Raw Water Dam

Feasibility Study
Detailed Engineering Design
(All Disciplines)
Procurement
Project Management
Construction Management
Erection
Commissioning

$25 Million

back to top

 

AngloGold Ltd*
Mali
(2001)


Enlarge photo
Sadiola Gold Project Plant Contract
Supply, Ship and Erect all Equipment.
Earthworks
CIS & Solution Management
Cyanide Plant
Water Reticulation
Oxygen Plant
Leach Expansion

$7,6 Million

back to top

 

AngloGold Ltd*
Mali
(2000)


Enlarge photo
Yatela Gold Mine
Heap Leach Project
2.5 Million tons per annum
Plant Contract
Supply, Ship and Erect all Equipment.
Earthworks
Liners
Village & Plant Buildings
CIS & Solution Management
Power Reticulation
Carbon Regeneration
Electrowinning Upgrade

$30 Million

back to top

 

RandGold Resources*
Mali
(1997 / 1998)

Syama Mine Housing Estate, Offices and Admin Block.

Crusher and Stockpile, Power Generation, Flotation Plant, Elution / Electrowinning / Smelt House, Mine Security and Access Control, SAG and Regrind Mills, Warehouse, Oxygen Plant

Detailed Engineering Design
(All Disciplines)
Procurement
Project Management
Construction Management

$38 Million

back to top

 

RandGold Resources*
Mali
(1997 / 1998)


Enlarge photo
Loulo Mine

Access and Feasibility Studies
Infrastructural Requirements

$115,000

back to top

 

AvGold*
Hartebeestfontein Division South Africa
(1997)

160,000 tpm SAG / FAG
Mill Installation Feasibility Study
Complete Investigation and Preparation of Bankable Documents

All Disciplines

R 180,000

back to top

 

Blyvooruitzicht Gold Mine*
South Africa
(1999)


Enlarge photo
Doornfontein Ore Belt Shaft to Stockpile

R2.0 Million

back to top

 

Blyvooruitzicht Gold Mine*
South Africa
(1999)

Vlei / Dam Retreatment Facility

R1,6 Million

back to top

 

Blyvooruitzicht Gold Mine*
South Africa
(1999)

Washing, Screening and Materials Handling Plant

R2,5 Million

back to top

 

Blyvooruitzicht Gold Mine*
South Africa
(1998)

Single Stream AARL
8 Tonne Elution Plant
Detailed Engineering Design
(All Disciplines)
Procurement
Project Management
Construction Management

R6,5 Million

back to top

 

Blyvooruitzicht Gold Mine*
South Africa
(1996 / 1997)

Carbon in Pulp Plant
240,000 tpm
Detailed Engineering Design
(All Disciplines)
Procurement
Project Management
Construction Management

R11.0 Million

back to top

 

Buffelsfontein Gold Mines*
South Africa
(1997)

8 Stage CIP Plant Detailed Engineering Design
(All Disciplines)
Procurement
Project Management
Construction Management

R10.0 Million

back to top

 

Buffelsfontein Gold Mines*
South Africa
(1997)

Relocation and Installation of ROM Mill complete with Conveyors, Silo and Mill Circuit Detailed Engineering Design
(All Disciplines)
Procurement
Project Management
Construction Management

R12,4 Million

back to top

 

Caltex Refinery*
Cape Town, South Africa
(1990)

Anti-Knock Engines and Associated Equipment

Supply
Procurement
Specifications

R1,2 Million

back to top

 

De Beers*
Jwaneng
(1994)

Fines Recovery Plant Mechanical Design
Project Managemen

R 450,000

back to top

 

Doornfontein Gold Mines*
South Africa
(1997)

120,000 tpm SAG Mill
Thickening, Leach and CIP Project
Detailed Engineering Design
(All Disciplines)
Procurement
Project Management
Construction Management

R 800,000

back to top

 

DRD Gold Limited*
South Africa
(1996 & 1997)

Central Elution Plant, Five Stream Central Elution and Electrowinning Facility Detailed Engineering Design
(All Disciplines)
Procurement
Project Management
Construction Management

R25.0 Million

back to top

 

Durban Roodepoort Deep G.M*
South Africa
(1996 to 1997)

Sag Mill, Circuit Thickening and CIP Plants Detailed Engineering Design
(All Disciplines)
Procurement
Project Management
Construction Management

R41,5 Million

back to top

 

Fluor*
SASOL, Secunda South Africa
(1995)

Sastech Sodium Cyanide / Acrylonitrile Plant
Mechanical Design
Specifications
Contract / Orders
Project Management
Construction Management

R26.0 Million, R 250,000 for Reimbursable Man-hours

back to top

 

Fluor*
South Africa
(1995)

Expansion of Palaborwa Copper Mine Mechanical Design
Surface & Underground
Design
Specifications
Cost Control
Planning
Fluor D.O Control
Project Engineering

R42.0 Million, R 200,000 for Reimbursable Man-hours

back to top

 

Interboard*
Krugersdorp, South Africa
(1991)

Ceramic Tile Drying Tunnel and Associated Fans and Ducting etc. Process Design
Mechanical Design
Procurement
Specifications
Project Management

R1,1 Million

back to top

 

Kalagadi Breweries*

(1995)

Bright Beer Cellar Support Structure Structural & Civil Design
Procurement
Fabrication
Project Management
Construction Management

R 500,000

back to top

 

Mine Waste Solutions*
Stilfontein, South Africa
(2002)

Chemwes Enviromental
Remediation Project
570,000 tpm CIL
(Gold)
Detailed Engineering Design
(All Disciplines)
Procurement
Project Management
Construction Management
Erection
Commissioning

R90 Million

back to top

 

Newlands Brewery*
Newlands , Cape Town
(1994)

Design of Dust Extraction System Design
Procurement
Project Management

R 180,000

back to top

 

Newlands Brewery*
Newlands , Cape Town
(1993)

Design of Packaging Hall
High Pressure Cleaning System
Design
Specifications
Contract / Tenders
Project Management

R 660,000

back to top

 

Pretklerk Gold Mine*
Nigel, South Africa
(1995)

Responsible Engineer Contract Basis Mechanical & Electrical
Design
Operation & Maintenance
Legal Requirements

back to top

 

United Breweries*
Ga-Rankua
(1994)

Utilities Supply to Packaging Line
Utilities Design
Steam Design
Specifications
Quality Assurance
Project Management

R 280,000

back to top

 

Rosslyn Brewery*
South Africa
(1992)

Design of Brewhouse Water Mixing Stations,
Pipe Work and Pumping System
Mechanical Design
Process Design
Instrument Design
Project Management

R 580,000

back to top

 

South African Breweries*
Prospecton, Durban
(1989)

Modification to CIP Plants and Beer Supply Lines
Design
Specifications
Project Management

R 320,000

back to top

 

South African Breweries*
Prospecton, Durban
(1988)

Caustic Recovery,
Filtration and Holding Plant
Process Design
Mechanical Design
Civil / Structural Design
Specifications
Procurement
Project Management

R1,8 Million

back to top

 

SASOL Research & Development*
Sasolburg, South Africa
(1991)

Design of Pressure Vessels,
Pumps, Short Path Distillation
Unit and Associated Equipment
Mechanical Design
Distillation Unit
Process Design
Supply (Part)

R 310,000

back to top

 

West Wits Gold Mine*
South Africa
(1998 / 1999)


Enlarge photo
North Sand Dump - Pre-concentration Plant Feasibility Study
Detailed Engineering Design
(All Disciplines)
Tender Documents

R 900,000

back to top

 

West Wits Gold Mine*
South Africa
(1998)


Enlarge photo
220,000 tpm Leach Tank Farm

Detailed Engineering Design
(All Disciplines)
Procurement
Project Management
Construction Management
Detailed Engineering Design
(All Disciplines)
Procurement
Project Management
Construction Management

R3.2 Million

back to top

 

West Witwatersrand Gold Mine*
South Africa
(1996)


Enlarge photo
North Sand Dump Reclamation and CIL Conversion Mechanical & Electrical
Design
Procurement
Project Management
Construction Management

R8.0 Millio

back to top

 

West Witwatersrand Gold Mine*
South Africa
(1995 / 1996)


Enlarge photo
Sag Mill Project

Incorporating Crushing, Milling and Thickening Plant for 100,000 tpm rock and 120,000 tpm Sand
Detailed Engineering Design
(All Disciplines)
PLC Control
Procurement
Project Management
Construction Management
Planning
Cost Control

R43.0 Million

back to top

 

Independence Gold Mining*
Zimbabwe (PVT) LTD
(2000)

How Gold Mine Upgrade
(AARL Elution Plant)
Design
Project Procurement

R 600,000

back to top